Scope of Work:
- Bridge Length : 150 m2
- Bridge width : 9 m2
- Drainage & Box Culvert
- Prefabricated Vertical Drain 13 m2
- Granular Pavement (LPA & LPB)
- Asphalt Pavement / Chip Seal Double Layer 1.150 m2
- Erection Work
- Concrete Abutment, Pier & Slab
- Steel Structure Girder (Launching Girder Method)
- Ceiling Fence 300 m2
- Approach Slabs Bridge 1.150 m2
- Guard Rail Installation 1.138 m2
- Galvanized Gabion 1.221 m3
- Installation of street and bridge lighting